Skip to main content
Building Depot — Ontario's Authorized MegaDome Dealer for Engineered Fabric Buildings
Fabric truck and fleet storage building installed in Ontario by Building Depot
TRUCK & FLEET STORAGE · ONTARIO

Fleet & truck buildings, built for heavy use.

Clear-span fabric shops and storage buildings for Ontario fleets — drive-through bays, oversized doors, year-round comfort.

WHY FABRIC FOR FLEETS

Engineered for trucking operators.

Drive-Through Bays

Clear-span widths up to 150' fit full tractor-trailer turning circles and double parking.

Oversized Door Ready

Engineered headers accept rolling steel, sectional and high-speed doors sized for heavy trucks.

Bright, Naturally Lit

Translucent membrane cuts daytime lighting costs — drivers and techs work in true daylight.

Insulation & Heat Ready

Liner packages and tube-heater integration available for year-round Ontario operation.

ONTARIO'S AUTHORIZED MEGADOME DEALER

The complete guide to truck and fleet storage.

Building Depot is the Authorized MegaDome Dealer for Ontario and truck and fleet storage buildings are one of the most-specified MegaDome configurations across the province. Engineered truck and fleet storage buildings combine a hot-dip galvanized steel arch frame with a high-tenacity PVC membrane to deliver a clear-span, naturally lit, corrosion-resistant envelope that lasts decades with a fraction of the operating cost of conventional steel or wood construction.

Ontario trucking carriers, owner-operators and fleet yards use MegaDome buildings to enclose tractor and trailer storage, fleet maintenance and yard operations. Clear-span widths and drive-through layouts accommodate the full Ontario fleet — tandem, triaxial, dump and trailer combinations — without column conflicts.

Building Depot has installed truck-and-fleet buildings for LTL carriers, dump-truck operators, snow-and-ice contractors and private fleets across Ontario.

This page is the complete Ontario reference for truck and fleet storage buildings — covering benefits, applications, construction process, engineering, foundation options, installation, warranty and ongoing maintenance. Every Building Depot project is delivered turnkey under one accountable contract: in-house engineering, stamped Ontario drawings, municipal permit management, foundation construction, fabric installation and full commissioning. One contract, one project manager, one phone number from kickoff to keys.

WHY MEGADOME

Headline benefits.

Clear-span widths to 200' — tandem, triaxial and trailer manoeuvre
Drive-through endwall doors — through-traffic operations
Translucent membrane — daylight maintenance environment
Insulated underliner option for heated fleet maintenance
Hot-dip galvanized steel — heavy-use durability
Faster build than conventional fleet-maintenance construction
Engineered to commercial yard loading and access
Combined fleet-storage and maintenance-bay layouts supported
APPLICATIONS

Where MegaDome fits.

Carrier Yards

LTL and FTL carrier yard tractor and trailer cover. Drive-through endwall and clear-span layout.

Dump-Truck & Aggregate

Dump-truck and aggregate-hauler fleet cover. Clear-span layout for tandem, triaxial and quad combinations.

Snow & Ice Contractor

Snow-and-ice contractor fleet and equipment cover. Co-located with salt domes for single-source winter operations.

Fleet Maintenance

Insulated, heated fleet maintenance bays. Drive-through layout with overhead crane and lift compatibility.

INDUSTRIES SERVED

Operators we build for across Ontario.

LTL CarriersDump-Truck OperatorsSnow & IcePrivate FleetsOwner-OperatorsYard Operations
CONSTRUCTION PROCESS

From contract to keys.

Every Building Depot truck and fleet storage buildings project follows the same disciplined sequence. It starts with a site visit and a needs interview so we understand the operation, the equipment moving through the building, the access routes and any local zoning or conservation constraints. From there our in-house designer produces a stamped engineering package — building dimensions, foundation, ventilation, door layouts and any internal partitions — sized to the application and engineered to the site's snow, wind and exposure category under the Ontario Building Code.

The stamped package goes straight into the municipal permit submission. Building Depot manages the back-and-forth with the local building department and coordinates any conservation authority, site plan or zoning approvals required for the site. While the permit is in review, the foundation crew is mobilized and the steel order goes into production so the project moves the day the permit is issued.

On site, the foundation runs first — pier, slab, L-block or curb wall, depending on the configuration. Steel arches are raised next using a mobile crane and the Building Depot install crew, the fabric membrane is tensioned over the engineered ratchet system, end walls are framed and clad, and any door, lighting or ventilation systems are commissioned. The owner gets one accountable contract, one project manager and one weekly status update from contract signing through to keys.

ENGINEERING

Stamped Ontario engineering on every project.

Every MegaDome truck and fleet storage buildings Building Depot delivers in Ontario ships with third-party engineering sealed by an Ontario P.Eng. and certified to CSA A660 — the Canadian standard for pre-engineered steel building systems. Engineering accounts for site-specific snow loads (1.6–3.5 kPa across the province), hourly wind pressures per the Ontario Building Code, unbalanced snow drift conditions and any seismic factors. Drawings include the full structural design, foundation reactions, anchor bolt schedules and ventilation specifications, and are submitted directly into the municipal permit package.

Engineering is included in every Building Depot quote — never billed separately, never outsourced to a third party the owner has to chase. The same engineering team that designs the building stands behind it through the permit process, the foundation inspection and any post-construction follow-up. That single accountable contract is why GTA developers, Northern Ontario mining operators and Eastern Ontario municipalities specify MegaDome through Building Depot as their default fabric building solution.

FOUNDATION OPTIONS

Engineered to your site, your budget and your soil.

Reinforced Slab

Engineered reinforced concrete slab with thickened edge under the perimeter base channel. Standard for shop, warehouse, dairy and wash-down applications.

Curb Wall + Pier

Pier foundation with a 12–24" perimeter curb wall poured monolithic with the floor. Standard for clean-floor commercial and equestrian buildings.

Concrete Pier

Drilled or augered reinforced concrete piers. Lowest-cost option, ideal for sites without a slab requirement and for sloped or rural builds.

INSTALLATION

Turnkey installation by Building Depot crews.

Building Depot maintains its own installation crews across Ontario — based in the GTA, Eastern Ontario and Northern Ontario — so we never sub-contract the install to a crew unfamiliar with MegaDome's tensioning system. A typical truck and fleet storage buildings install runs 2–4 weeks for the steel frame and membrane portion, on top of 1–2 weeks for the foundation and 1 week for end-wall and door commissioning. Larger or column-free wide-span buildings (140'+) add an additional week for staged arch erection.

Steel arches are raised in sequence using a mobile crane sized to the arch weight. The PVC membrane is tensioned over the steel using engineered ratchet tensioners, with a 24-hour set period followed by a final tension check before sign-off. End walls are framed in galvanized steel and clad in matching membrane, insulated metal panel or owner-supplied finishes. Through the entire install, the client works with a single Building Depot project manager — no calling around for status updates, no finger-pointing between trades.

WARRANTY

Backed for the long haul.

MegaDome truck and fleet storage buildings carry a 25-year limited warranty on the structural steel frame and a 15-year limited warranty on the PVC membrane. Both warranties cover materials and workmanship and are honoured directly by Building Depot — Ontario's Authorized MegaDome Dealer — so warranty claims are resolved by the same team that installed the building, not bounced between a dealer, a manufacturer and a sub-contracted installer.

Hardware components — ratchet tensioners, anchor brackets, ventilation louvers and door systems — are covered under the membrane warranty. Building Depot maintains a full inventory of replacement membrane panels, brackets and hardware in Ontario, which means warranty service is typically scheduled within days, not the weeks it takes a U.S.-based supplier to ship parts across the border.

MAINTENANCE

Simple, predictable upkeep.

Maintenance on a MegaDome truck and fleet storage buildings is intentionally minimal — that's a core part of the value proposition versus conventional steel. Annual maintenance comprises a visual inspection of the membrane surface and ratchet tensioning system, a check of ridge vents and gable louvers, a tightening of anchor bolts where exposed and a wash-down of any accumulated debris. The hot-dip galvanized steel frame requires no painting, no rust treatment and no panel replacement over the building's design life, which is a meaningful operating-cost advantage over painted metal buildings that demand recoating every 10–15 years.

Building Depot offers an Ontario-wide annual inspection and re-tensioning service for operators who want a turnkey maintenance contract. A typical building requires a half-day visit once a year to remain in warranty-compliant condition. At the 5–7 year mark, our crews perform a full re-tension of the membrane to compensate for the natural relaxation that occurs in any PVC fabric structure. With that simple maintenance cycle, MegaDome buildings routinely deliver 25–30+ years of service before any fabric replacement is required.

FREQUENTLY ASKED

Truck & fleet storage questions, answered.

READY TO BUILD?

Get a Building Depot Ontario quote in 24 hours.

Tell us your site, size and end use. Our Ontario engineering team will scope, price and schedule your fabric building.

Ontario engineers on the line · quote returned within 24 business hours

  • Authorized
    MegaDome® Dealer for Ontario
  • 500+
    Ontario projects delivered
  • Turnkey
    Engineering · foundation · install
  • OBC
    P.Eng-stamped to Ontario Building Code
  • 25-yr
    Membrane warranty · 50-yr frame life