Skip to main content
Engineered MegaDome fabric building of the type Building Depot delivers across Timmins, Ontario
FABRIC BUILDINGS · TIMMINS

Fabric Buildings Timmins

Engineered MegaDome fabric buildings for Timmins and the northern gold belt \u2014 mining, forestry, workshop, salt and municipal.

TIMMINS \U00B7 COCHRANE DISTRICT \U00B7 NORTHERN ONTARIO

Engineered fabric buildings for Timmins owners.

Timmins is Ontario's most productive gold-mining city — a dense cluster of active mines, headframes, mills and mining-supply operators anchoring the Cochrane District. Forestry, municipal-services and rural-community operators fill out the market. MegaDome fabric buildings serve mine dry, ore and core storage, workshop, equipment, salt and remote-site work across the whole district.

Building Depot is Ontario's Authorized MegaDome Dealer. We deliver foundation, engineering, permitting and installation as one turnkey contract, with Ontario-stamped drawings submitted through the City of Timmins, Cochrane District or the applicable township.

Typical Timmins spans run 60–150 feet clear-width. Mine dry buildings, ore covers, core-storage, workshop, salt and equipment cover are all routine. Every structure is engineered to the heavy 2.9 kPa northern snow zone with wind loads calculated for exposure.

Every Timmins MegaDome carries a 15-year prorated membrane warranty and a 50+ year hot-dip-galvanized frame service life — designed to survive northern winters.

LOCAL CONDITIONS

Built for Timmins's climate and code.

2.9 kPa Snow Load

Timmins OBC ground snow — one of Ontario's heaviest zones.

Northern Ontario Wind

Hourly wind pressures recalculated for exposure.

OBC + CSA A660

Every structure stamped by an Ontario P.Eng.

Remote Northern Install

Crews and foundation equipment mobilized to Cochrane District routinely.

TIMMINS INDUSTRIES

Fabric building applications in Timmins.

Also serving near Timmins
Iroquois FallsCochraneKapuskasingMathesonSouth PorcupineKirkland Lake
FREQUENTLY ASKED

Fabric building questions from Timmins owners.

TIMMINS QUOTE

Request your Timmins fabric building quote.

Ontario engineering, foundation and installation on a single contract. No obligation.

Prefer to talk? Call 1-800-398-5053 — Ontario engineers on the line. By submitting you agree to be contacted about your project.

READY TO BUILD?

Get a fabric building quote for Timmins.

Send us your Timmins site details and we'll reply with drawings, pricing and timeline within 24 hours.

Ontario engineers on the line · quote returned within 24 business hours

  • Authorized
    MegaDome® Dealer for Ontario
  • 500+
    Ontario projects delivered
  • Turnkey
    Engineering · foundation · install
  • OBC
    P.Eng-stamped to Ontario Building Code
  • 25-yr
    Membrane warranty · 50-yr frame life
Aerial view of an engineered MegaDome fabric building of the type Building Depot delivers — serving a mining site near Timmins, Ontario
Engineered MegaDome fabric building — representative gold-belt mining-support configuration. Building Depot serves Timmins, Ontario.
Call Text Free Quote