Skip to main content
Fabric aircraft hangar with a wide door opening on an Ontario airfield
AIRCRAFT HANGARS ONTARIO

Sized to your aircraft, not a catalogue width.

Engineered MegaDome fabric hangars for Ontario airports, private strips and flying clubs — sized from the aircraft envelope, built with the right door strategy, and installed turnkey by one Ontario team.

Single-engine aircraft parked nose-in inside a fabric hangar with a full-width open door
Concept image. Clear opening, bay depth and clearances are set per aircraft and project.
BUILT AROUND THE AIRCRAFT

The envelope sets the building, not the other way around.

A hangar that's sized wrong shows up every time the doors open — wingtips too close to the frame, a tail fin that just clears the header, a tow path that needs a three-point turn. We start with the aircraft: wingspan, tail height, fuselage length and how it's parked, then build the clear-span structure and door opening around that, with margin for the aircraft you might add later.

  • →Clear-span frame — no columns interrupting the taxi path
  • →Door clear opening confirmed against your tallest tail and widest wingspan
  • →Stamped engineering for your airport or strip's snow and wind zone
  • →Membrane warranty terms confirmed in the issued documents

Sized to the Aircraft Envelope

Wingspan, tail height and tow path drive the dimensions — not a stock width off a price sheet.

Door Strategy That Matches Your Apron

Bi-fold, hydraulic one-piece or sliding, chosen for clear opening, wind exposure and how the apron is used.

Daylight Through the Membrane

Natural light across the whole bay for inspection and maintenance work without a full overhead lighting array.

Engineered for Ontario Loads

Stamped to the snow, wind and seismic loads for your airport or strip, from Southern Ontario to the north.

SIZING THE HANGAR

From tail number to floor plan.

Before a dimension gets quoted, we work through the aircraft and how it's operated day to day. These are the inputs that actually set the building:

  • →Wingspan and tail height of the largest aircraft you'll store, including any you plan to add
  • →Nose-in versus side-by-side parking, and how many aircraft share the bay
  • →Wingtip-to-wingtip and wingtip-to-wall clearance for taxiing and towing
  • →Tow bar path and turning room getting the aircraft in and squared away
  • →Door clear opening — width and height with the door fully retracted
  • →Room for a workbench, parts storage or a tug without crowding the parked aircraft

Send those numbers and we'll come back with a bay size, door recommendation and a preliminary budget range. Preliminary figures are for budgeting only — final pricing follows engineering, site conditions and the configuration you select.

Get a preliminary project budget
Fabric aircraft hangar with a full-width bi-fold door fully open and a light aircraft parked inside on the apron edge
Concept image of a full-width door opening onto the apron. Door type, clear opening and apron grading are set per site.
DOOR STRATEGY

The door is the real constraint, not the wall.

Whatever the building width is, the number that governs day-to-day operation is the door's clear opening — width and height with the panel fully retracted. Full-width bi-fold doors maximize clear opening and suit sites with limited headroom above the door. Hydraulic one-piece doors open fast and hold up well in wind, but need vertical clearance to swing up. Sliding doors keep the apron in front of the building clear while opening, which matters on a tight ramp.

  • →Clear opening sized to your widest wingspan and tallest tail, with margin
  • →Door choice matched to prevailing wind and apron layout
  • →Personnel doors and access sized separately from the aircraft door
  • →One contract from foundation through door installation
See our door options

What sets a hangar apart from a general clear-span building

  • Full-width door instead of a standard overhead door
  • Clear height set by tail fin, not eave height convention
  • Apron approach and taxi line planned with the building, not after it
  • Floor slab detailed for tie-downs, drainage and ground support equipment
SITE & OPERATIONAL PLANNING

What we walk through before drawings start.

Apron and taxiway approach

How the aircraft actually reaches the door — taxi line, turning radius, and whether the apron needs to be poured or tied into an existing surface.

Floor slab intent

Tie-down provisions, drainage slope for wash-down and de-icing runoff, and whether the slab needs to support a tug or ground power unit.

Heating and condensation

Makeup air and heater placement planned around engine runs and panel-off maintenance, not added after the building is up.

Approvals and land status

Airport-authority coordination and municipal permit drawings, and whether the site is a private strip or leased airport land.

Private strip or leased airport land changes what has to be coordinated. A private strip is mostly a site-conditions conversation — drainage, soil bearing, your own apron. Leased airport land adds authority approvals, lease-line setbacks and, on some fields, shared taxiway access. We plan around whichever applies to your site.

WHO WE BUILD FOR

Different operators, different priorities.

Private owners and flying clubs

Single-aircraft and multi-bay hangars sized around the fleet a club actually operates, with room to grow into a second aircraft.

Charter and corporate flight departments

Faster turn times matter — door strategy and apron layout are planned around how quickly the aircraft needs to be in and out.

Maintenance operators

Bay depth, daylight and heating planned around panel-off work, not just overnight parking.

Agricultural and utility aviation

Ag aircraft and utility fleets stored alongside loading and chemical-handling areas, with clearances that account for spray booms and external tanks.

Remote and northern strips

Hangars engineered for northern snow and wind loads, built where access and site work are the real schedule drivers.

INSTALLED ACROSS ONTARIO

From licensed airports to private strips.

Building Depot installs and services aircraft hangars for private owners, flying clubs, charter operators and maintenance shops across Ontario, including remote and northern strips. One crew handles the foundation, the frame, the membrane and the doors — and the same team comes back for service and eventual membrane replacement.

Fabric aircraft hangar exterior with wide clear-span door opening
ONTARIO'S AUTHORIZED MEGADOME DEALER

The complete guide to aircraft hangars.

Building Depot is the Authorized MegaDome Dealer for Ontario and aircraft hangars are one of the most-specified MegaDome configurations across the province. Engineered aircraft hangars combine a hot-dip galvanized steel arch frame with a high-tenacity PVC membrane to deliver a clear-span, naturally lit, corrosion-resistant envelope that lasts decades with a fraction of the operating cost of conventional steel or wood construction.

MegaDome aircraft hangars deliver a clear-span, naturally lit, corrosion-resistant envelope tailored to Ontario general aviation, business jet, regional carrier and flight school operations. Clear-span widths to 200 feet accommodate a Beechcraft King Air, Pilatus PC-12, Cessna Citation or larger turboprop without internal columns, and bi-fold or hydraulic hangar door options span the full opening for unobstructed tail clearance.

Building Depot has installed hangars at municipal airports across Ontario for private owners, charter operators, flight schools and FBOs. Every hangar is engineered to the aerodrome's site-specific snow and wind loads and coordinated with the airport authority's site plan and Transport Canada considerations where required.

This page is the complete Ontario reference for aircraft hangars — covering benefits, applications, construction process, engineering, foundation options, installation, warranty and ongoing maintenance. Every Building Depot project is delivered turnkey under one accountable contract: in-house engineering, stamped Ontario drawings, municipal permit management, foundation construction, fabric installation and full commissioning. One contract, one project manager, one phone number from kickoff to keys.

WHY MEGADOME

Headline benefits.

Clear-span widths to 200' — multi-aircraft hangar capacity
Bi-fold and hydraulic hangar door options to full clear opening
Translucent membrane — full daylight maintenance environment
Hot-dip galvanized steel — coastal and northern climate proof
Engineered to aerodrome snow and wind exposure
Faster occupancy than conventional steel hangar construction
Insulated underliner option for heated hangar operations
Future expansion via end-wall additions
APPLICATIONS

Where MegaDome fits.

General Aviation Hangars

Private owner and shared GA hangars at municipal aerodromes. Sized for single or multi-aircraft tenancy.

Business Aviation

Business jet and turboprop hangars for charter operators and FBOs. Bi-fold door to full clear opening.

Flight School & Maintenance

Flight school hangars and AME maintenance facilities. Translucent daylight for maintenance, insulated underliner option.

Helicopter Hangars

Rotor-wing hangars for EMS, MNR, police and private operators. Lower-height clear-span configuration with rolling or bi-fold door.

INDUSTRIES SERVED

Operators we build for across Ontario.

General AviationBusiness AviationCharter OperatorsFlight SchoolsEMS & Police AviationMNR & Government Aviation
CONSTRUCTION PROCESS

From contract to keys.

Every Building Depot aircraft hangars project follows the same disciplined sequence. It starts with a site visit and a needs interview so we understand the operation, the equipment moving through the building, the access routes and any local zoning or conservation constraints. From there our in-house designer produces a stamped engineering package — building dimensions, foundation, ventilation, door layouts and any internal partitions — sized to the application and engineered to the site's snow, wind and exposure category under the Ontario Building Code.

The stamped package goes straight into the municipal permit submission. Building Depot manages the back-and-forth with the local building department and coordinates any conservation authority, site plan or zoning approvals required for the site. While the permit is in review, the foundation crew is mobilized and the steel order goes into production so the project moves the day the permit is issued.

On site, the foundation runs first — pier, slab, L-block or curb wall, depending on the configuration. Steel arches are raised next using a mobile crane and the Building Depot install crew, the fabric membrane is tensioned over the engineered ratchet system, end walls are framed and clad, and any door, lighting or ventilation systems are commissioned. The owner gets one accountable contract, one project manager and one weekly status update from contract signing through to keys.

ENGINEERING

Stamped Ontario engineering on every project.

Every MegaDome aircraft hangars Building Depot delivers in Ontario ships with third-party engineering sealed by an Ontario P.Eng. and certified to CSA A660 — the Canadian standard for pre-engineered steel building systems. Engineering accounts for site-specific snow loads (1.6–3.5 kPa across the province), hourly wind pressures per the Ontario Building Code, unbalanced snow drift conditions and any seismic factors. Drawings include the full structural design, foundation reactions, anchor bolt schedules and ventilation specifications, and are submitted directly into the municipal permit package.

Engineering is included in every Building Depot quote — never billed separately, never outsourced to a third party the owner has to chase. The same engineering team that designs the building stands behind it through the permit process, the foundation inspection and any post-construction follow-up. That single accountable contract is why GTA developers, Northern Ontario mining operators and Eastern Ontario municipalities specify MegaDome through Building Depot as their default fabric building solution.

FOUNDATION OPTIONS

Engineered to your site, your budget and your soil.

Reinforced Slab

Engineered reinforced concrete slab with thickened edge under the perimeter base channel. Standard for shop, warehouse, dairy and wash-down applications.

Curb Wall + Pier

Pier foundation with a 12–24" perimeter curb wall poured monolithic with the floor. Standard for clean-floor commercial and equestrian buildings.

Concrete Pier

Drilled or augered reinforced concrete piers. Lowest-cost option, ideal for sites without a slab requirement and for sloped or rural builds.

INSTALLATION

Turnkey installation by Building Depot crews.

Building Depot maintains its own installation crews across Ontario — based in the GTA, Eastern Ontario and Northern Ontario — so we never sub-contract the install to a crew unfamiliar with MegaDome's tensioning system. A typical aircraft hangars install runs 2–4 weeks for the steel frame and membrane portion, on top of 1–2 weeks for the foundation and 1 week for end-wall and door commissioning. Larger or column-free wide-span buildings (140'+) add an additional week for staged arch erection.

Steel arches are raised in sequence using a mobile crane sized to the arch weight. The PVC membrane is tensioned over the steel using engineered ratchet tensioners, with a 24-hour set period followed by a final tension check before sign-off. End walls are framed in galvanized steel and clad in matching membrane, insulated metal panel or owner-supplied finishes. Through the entire install, the client works with a single Building Depot project manager — no calling around for status updates, no finger-pointing between trades.

WARRANTY

Backed for the long haul.

MegaDome aircraft hangars carry a 25-year limited warranty on the structural steel frame and a 15-year limited warranty on the PVC membrane. Both warranties cover materials and workmanship and are honoured directly by Building Depot — Ontario's Authorized MegaDome Dealer — so warranty claims are resolved by the same team that installed the building, not bounced between a dealer, a manufacturer and a sub-contracted installer.

Hardware components — ratchet tensioners, anchor brackets, ventilation louvers and door systems — are covered under the membrane warranty. Building Depot maintains a full inventory of replacement membrane panels, brackets and hardware in Ontario, which means warranty service is typically scheduled within days, not the weeks it takes a U.S.-based supplier to ship parts across the border.

MAINTENANCE

Simple, predictable upkeep.

Maintenance on a MegaDome aircraft hangars is intentionally minimal — that's a core part of the value proposition versus conventional steel. Annual maintenance comprises a visual inspection of the membrane surface and ratchet tensioning system, a check of ridge vents and gable louvers, a tightening of anchor bolts where exposed and a wash-down of any accumulated debris. The hot-dip galvanized steel frame requires no painting, no rust treatment and no panel replacement over the building's design life, which is a meaningful operating-cost advantage over painted metal buildings that demand recoating every 10–15 years.

Building Depot offers an Ontario-wide annual inspection and re-tensioning service for operators who want a turnkey maintenance contract. A typical building requires a half-day visit once a year to remain in warranty-compliant condition. At the 5–7 year mark, our crews perform a full re-tension of the membrane to compensate for the natural relaxation that occurs in any PVC fabric structure. With that simple maintenance cycle, MegaDome buildings routinely deliver 25–30+ years of service before any fabric replacement is required.

HAVE AN AIRCRAFT, SITE OR DRAWING SET?

Send your project to Building Depot.

Upload architectural or engineering drawings, site plans, specifications, tender documents or photos. Our Ontario engineering team reviews every submission and responds with scope, pricing and schedule.

  • Architectural & engineering drawings
  • Site plans and grading information
  • Specifications and tender documents
  • Building dimensions and photos
Submit Your Hangar Project Get a Preliminary Project Budget

Tenders, RFPs and early-stage budgets all welcome

FREQUENTLY ASKED

Ontario aircraft hangars — answered.

SIZE YOUR HANGAR

Tell us the aircraft and the site.

We'll size the bay, recommend a door strategy and design the foundation — one Ontario crew, one contract.

Ontario engineers on the line · quote returned within 24 business hours

  • Authorized
    MegaDome® Dealer for Ontario
  • 500+
    Ontario projects delivered
  • Turnkey
    Engineering · foundation · install
  • OBC
    P.Eng-stamped to Ontario Building Code
  • 25-yr
    Membrane warranty · 50-yr frame life
Call Text Free Quote