Aviation Hangar

Building Depot delivered a 90' × 90' × 24' MegaDome aviation hangar at a Northern Ontario regional airport, fitted with an engineered 80' bi-fold hangar door and a translucent membrane for daylight maintenance.

Northern Ontario 90' W × 90' L × 24' H· 8 weeks

The Customer

A Northern Ontario charter operator running a King Air B200 plus support fleet out of a regional airport. The operator wanted a dedicated maintenance hangar to bring scheduled maintenance in-house and reduce dependence on out-of-region MROs.

The Challenge

The hangar had to fit a King Air with full wing clearance, accept a future Caravan as a second tenant, and meet Transport Canada and NAV CANADA airport site review requirements. The build had to fit within a single summer construction window.

The Solution

A 90' × 90' × 24' MegaDome with an engineered 80' wide × 18' tall bi-fold hangar door, concrete slab foundation and translucent membrane for daylight maintenance. Stamped engineering and full airport site coordination.

Why MegaDome Was Selected

MegaDome was selected because the clear-span geometry gave the full hangar footprint without internal columns, the translucent membrane reduces daytime lighting cost during maintenance, and the 8-week build cycle fit the summer construction window with margin.

Construction Process

Site prep, slab forms and underground services in weeks one and two. Slab pour in week three. Frame erection weeks four through six. Membrane and bi-fold door installation weeks seven and eight. Commissioning on the final day.

Foundation Construction

Engineered reinforced concrete slab with a thickened edge under the perimeter base channel. The bi-fold door header was supported on engineered columns tied to the slab with a thickened pad. Slab finish was a hangar-grade smooth trowel with engineered control joints.

Installation

Steel arches raised in three weeks. Membrane tensioned the following week. Bi-fold door installed and commissioned by a specialist door contractor as part of the Building Depot turnkey scope. Final walk-through with the operator and airport authority on the closing day.

Building Specifications

Building dimensions90' W × 90' L × 24' H
Bi-fold door80' W × 18' H, engineered
FoundationReinforced concrete slab, thickened edge
FrameHot-dip galvanized steel
MembraneTranslucent PVC for daylight maintenance
CapacityKing Air B200 + future Caravan

Project Results

  • Dedicated King Air maintenance hangar online in 8 weeks
  • In-house maintenance reduced out-of-region MRO travel
  • Translucent membrane reduces daytime lighting cost
  • Engineered for future Caravan tenant
  • Full airport site review cleared without delay

Customer Benefits

  • Lower MRO travel cost — maintenance in-house
  • Faster turnaround on scheduled checks
  • Lower lighting cost during daytime maintenance
  • Expansion capacity for additional aircraft
  • Single turnkey contract through door commissioning

Project Gallery

Northern Ontario aviation hangar during installation

Need a building like this?

Building Depot is Ontario's Authorized MegaDome Dealer. Engineering, permits, foundation and turnkey installation — one accountable contract.

FREQUENTLY ASKED

Frequently Asked Questions

Related Solutions & Services

More Case Studies

READY TO BUILD?

Get a Building Depot Ontario quote in 24 hours.

Tell us your site, size and end use. Our Ontario engineering team will scope, price and schedule your fabric building.

Call Text Free Quote