All case studiesCase Study · Mining

Northern Ontario Mine Truck Maintenance Shop

A 100' × 240' × 32' MegaDome maintenance shop delivered to a Timmins gold operation, engineered to house two haul trucks side-by-side under a heated, clear-span envelope. Turnkey delivered in 11 weeks.

Timmins, ON 100' × 240' × 32'· 11 weeks

The Customer

A Northern Ontario mid-tier gold producer operating a haul-truck fleet that was maintained outdoors year-round. Winter maintenance windows were losing days to weather and heater fuel was climbing.

The Challenge

The operator needed a heated, clear-span shop tall enough to bed-up a Cat 785 haul truck (needing 30' clear at the ridge), wide enough to run two trucks side-by-side, and built inside a single ice-free summer window. Foundation had to work on the site's shallow bedrock.

The Solution

A 100' × 240' × 32' MegaDome with hot-dip galvanized frame, AR-series lower wall panels for tire contact zones, insulated membrane package, radiant tube heat and a full concrete slab with trench drainage tied to the mine's oil-water separator. Foundation was engineered anchor blocks pinned to the bedrock.

Why MegaDome Was Selected

MegaDome was chosen because the clear-span geometry gave two haul-truck lanes without columns, the galvanized frame handles the ammonia and hydrocarbon environment, and the 11-week build cycle fit the ice-free window between spring melt and freeze-up.

Construction Process

Anchor block layout and bedrock pinning in weeks one and two. Slab and trench drains in weeks three and four. Frame raising weeks five through seven. Membrane, insulation and end walls weeks eight and nine. Radiant heat and electrical commissioning weeks ten and eleven.

Foundation Construction

Engineered concrete anchor blocks pinned to shallow bedrock with grouted rock anchors, tied together with a reinforced concrete slab and trench drainage system routed to the site's existing oil-water separator.

Installation

MegaDome arches raised in three weeks using a 90-ton crane. Insulated membrane package tensioned over the following two weeks. AR-series lower wall panels installed in the contact zone. Radiant tube heat and LED lighting commissioned in the closing week.

Building Specifications

Building dimensions100' W × 240' L × 32' H
Footprint24,000 sq ft clear-span
FrameHot-dip galvanized steel arches
Lower wallsAR-series abrasion-resistant panels
InsulationInsulated membrane package
FoundationAnchor blocks pinned to bedrock + reinforced slab
HeatRadiant tube, propane-fed
DrainageTrench drains to oil-water separator

Project Results

  • Two-truck heated bays operational before freeze-up
  • Winter maintenance downtime cut by roughly 40%
  • Heater fuel per truck-hour down 30% vs. outdoor tenting
  • Zero structural issues through two Timmins winters
  • Ministry environmental review cleared

Customer Benefits

  • All-weather maintenance for haul-truck fleet
  • Clear-span two-lane geometry — no column conflicts
  • AR-series panels handle tire and equipment contact
  • Insulated envelope reduces heating fuel spend
  • Ontario-stamped engineering and single accountable contract

Project Gallery

Haul truck inside the Timmins maintenance buildingFrame raising on the Timmins mine site

Need a building like this?

Building Depot is Ontario's Authorized MegaDome Dealer. Engineering, permits, foundation and turnkey installation — one accountable contract.

FREQUENTLY ASKED

Frequently Asked Questions

Related Solutions & Services

More Case Studies

READY TO BUILD?

Get a Building Depot Ontario quote in 24 hours.

Tell us your site, size and end use. Our Ontario engineering team will scope, price and schedule your fabric building.

Ontario engineers on the line · quote returned within 24 business hours

  • Authorized
    MegaDome® Dealer for Ontario
  • 500+
    Ontario projects delivered
  • Turnkey
    Engineering · foundation · install
  • OBC
    P.Eng-stamped to Ontario Building Code
  • 25-yr
    Membrane warranty · 50-yr frame life
Call Text Free Quote